AI Data Center Infrastructure

FaradMod

Power. Modularized.

Powered sites and purpose-built modular infrastructure for focused AI workloads across the United States.

01 / MARKETUnited States
02 / DELIVERYPrefabricated + modular
03 / MODELOff-taker aligned

What we do

From energized land to an operating AI facility.

One coordinated path across site acquisition, modular EPC delivery, and long-term operations.

01

Powered site acquisition

We help buyers identify and acquire greenfield sites suited to AI data center development—with power availability as the decisive criterion.

GREENFIELD POWER ACCESS SITE DILIGENCE
02

Modular EPC delivery

Prefabricated and modular data center systems engineered around each off-taker’s machine specifications, load profile, and deployment requirements.

PREFABRICATED CUSTOM ENGINEERING EPC
03

Off-taker & operations

We support off-taker contracting, operating coordination, and the related services needed to move from infrastructure to productive AI capacity.

CONTRACTING OPERATIONS RELATED SERVICES

WHY MODULAR

EPC, engineered for the AI era

EPC stands for Engineering, Procurement, and Construction — one contract, one partner accountable for your entire data center build. FaradMod delivers it the modular way: data center modules prefabricated in a factory — power, liquid cooling, and IT halls pre-installed and tested — then assembled on our powered land in months, not years.

One NVIDIA GB300 NVL72 rack draws 132–140kW — nearly 10x a traditional rack — and demands liquid cooling. Legacy buildings simply can't handle it. Our modules are engineered around your exact server spec, from 140kW-per-rack power delivery to direct-liquid-cooling loops.

01

Faster

Months, not years. Factory prefabrication runs in parallel with site prep, cutting delivery to a fraction of conventional builds.

02

Purpose-built

Engineered for your GPU spec. Power density, cooling, and layout designed around your exact servers — GB300 NVL72 included.

03

One accountability

A single EPC contract covering design, procurement, and construction. Factory-tested before it ships; you deal with one partner.

DELIVERY PATH
01

Powered land

We secure sites with energized power.

02

Design to spec

Modules engineered around your server and MW target.

03

Factory build

Prefabricated and fully tested off-site.

04

Assemble & energize

Rapid on-site assembly, then power-on.

Selected projects

Powered opportunities. Engineered for deployment.

PROJECT 01 / TEXAS

Texas 30MW AI Data Center Project

Powered Greenfield · Ready for Modular AI Data Centers / HPC

30MWPower capacity
12MWEnergized now
Contact us
  • 30MW power capacity — Phase 1: 12MW energized and ready now; Phase 2: 18MW expected Q1 2027.
  • ~4.5-acre greenfield ideal for modular AI data centers.
  • Fiber from 2+ carriers, with bandwidth up to 400Gbps.
  • On-site water plus a nearby natural gas pipeline for gas generation or backup power redundancy.
  • Ideal for modular AI data centers and HPC clusters.
PROJECT 02 / SOUTHEASTERN U.S.

Southeastern U.S. 50MW Power Infrastructure Site

Off-Market · Ultra-Low Power Cost · Development-Ready

50MWPower capacity
3.7–4.9¢All-in / kWh
Contact us
  • 50MW power capacity confirmed by power study (Nov 2025).
  • All-in power pricing of 3.7–4.9¢/kWh, tiered by uptime and 40–60% below U.S. industrial averages.
  • 15-acre flat site with no zoning restrictions, adjacent to a substation with 44.7 kV transmission access.
  • Dark fiber available with low latency, plus on-site water access.
  • Ideal for AI/HPC compute and large-scale modular deployment.
  • Off-market opportunity — full details released under NDA.

About FaradMod

Infrastructure shaped by power and workload—not convention.

FaradMod is an AI data center EPC company focused on smaller-load, prefabricated and modular facilities in the United States.

Our approach starts with the two constraints that matter most: securing usable power and turning it into deployable capacity through modular design.

  1. 01Power-first site strategy
  2. 02Machine-specific modular engineering
  3. 03Aligned delivery through operations

Common questions

What off-takers ask first.

Commercial structure, energization, machine fit, and the path to a project-level conversation.

01

How is capacity priced?

Capacity agreements are typically structured as long-term leases quoted in $/kW/month, sized to your MW target and energization timeline. Tell us your load profile and we will align the commercial structure.

02

How fast can we get energized capacity?

Our Texas project has 12MW energized today, with another 18MW expected in Q1 2027. Once design is locked, modular builds assemble on site in months, not years.

03

What server specs do you support?

Modules are engineered around your exact GPU spec — for example, NVIDIA GB300 NVL72 racks at 132–140kW each with direct liquid cooling. Share your machine specs and we design the power and cooling around them.

04

How do we start?

Send a message through the contact form below. For project-level detail we sign an NDA first, then align on specs, timeline, and commercial terms, typically moving toward an LOI.

05

Do you sell powered land?

Yes. We help buyers identify and acquire greenfield sites suited to AI data center development, with power availability as the decisive criterion.

Contact

Tell us what you are building.

Share your site, power, capacity, or deployment requirements. We’ll review the details and follow up directly.

POWERED LAND · MODULAR EPC · OFF-TAKER OPERATIONS